高级检索

工艺参数变化下的基于统计时序分析的时钟偏差安排

Statistical Timing Analysis Based Clock Skew Scheduling in Presence of Process Variations

  • 摘要: 针对工艺参数变化的情况,提出一种成品率驱动的时钟偏差安排算法.提出统计时序约束图的概念,利用统计时序分析的结果将时序电路转换为统计时序约束图;将寻找关键环问题转换为最小费用/时间比值环问题,并按比例分配关键环中的时钟偏差的安全余量.实验结果表明,该算法有助于提高集成电路的成品率.

     

    Abstract: A yield driven clock skew scheduling algorithm is proposed in presence of process variations. Firstly,we present the concept of statistical timing constraint graph and transform a sequential circuit into a statistical timing constraint graph by using the result of statistical timing analysis.Then,the slacks are assigned proportionally in the critical cycles,which are detected iteratively using the algorithm for minimum cost-to-time ratio cycle problem.Experimental results show that the algorithm can help with is improving the yield of integrated circuits.

     

/

返回文章
返回